October 31, 2018 online meeting minutes
Jump to navigation
Jump to search
present: Sergey Boyarinov, Gagik, Raffaella, Nathan, Graham, Pasyuk, Ben William Gu, vpk, Ed, Stepan
1. Daq crashes analysis
- tiInit fix: in tiLib.c library just after firmware reload procedure one line of code was added, it should fix observed problem, library compiled and installed Oct 30 night, watching logs
- "Missing slots" problem: in the past it was happening in FADCs, last night it happened in dc13, Ben will put extra debugging messages in rol1
- rcServer log: logging rcServer now, looking for problems observed (mysql gone away, cannot connect to port etc)
- VTP crashes: one of the VTPs hung, did not reboot itself, we will log tsconnect's from VTPs to see if any useful info is there
- CND-CTOF trigger is in process of implementation
2. Delayed helicity reporting correction in daq - possible; implement 2 counters for latch and HLS banks, will be in level3 by January
3. Trigger limits have to be set correctly, Valery and Raffaella will work to use appropriate procedure how to set limits, normally Valery will do that
4. BAND is running with cosmic, v1495-based trigger is implemented and used, full BAND have to be ready by January, will NOT participate in trigger