November 9, 2011 online meeting minutes

From CLONWiki
Jump to navigation Jump to search

present: Sergey Boyarinov, Eugene Pasyuk, FX, Nerses, Sergey Pozdnyakov, Hovanes, Alex Somov

1. g14b run preparations

  • silo partitions were assigned for g14b and test area
  • EPICS has some inter-subnet issues, clas_epics works on clon10; at least one HV board in NCS MF must be checked
  • one camac crate need repair on FC - was repaired already by Sergey P.
  • few TOF cables have broken connectors, Armen is working on
  • fan units must be repaired, need about 70 fans, will investigate options; at least we can move working fans above SFIs
  • TDC calib, TOF calib (maybe laser run), EC calib - need to put VXS crate instead of VME64X as ec3
  • LAC have to be checked before we put it back to the system
  • when ST connected, will check triggers including level2
  • check devices in dump area (harp, tac etc)
  • check helicity stuff
  • trigger files are ready in g14b area
  • new harp software needed


2. Test setups

  • put discr/fadc scalers under EPICS - Nerses is working, Sergey B. will help, will be used by Hall D and HPS
  • may need to connect Hall D crate (new TI) to clastrig2 branch, need to check with David Abbott how to do that
  • will provide 1Gbit (69) and one 100BaseT (167) for Hall D
  • will set clonpc3 for Hall B DAQ
  • will set new rack-mounted servers to test setup DAQs (former bonuspc's) with RHEL6 32-bit
  • HPS: chiller EPICS control (was on clonwin3); may reuse it or install LabView new version (will ask HDIce people - Chris Bass)
  • HPS: will try to install 2 racks on 2nd deck of SF; need to connect 2 crates, so need 2 new TIs and configure them as master-slave couple