November 9, 2011 online meeting minutes
Jump to navigation
Jump to search
present: Sergey Boyarinov, Eugene Pasyuk, FX, Nerses, Sergey Pozdnyakov, Hovanes, Alex Somov
1. g14b run preparations
- silo partitions were assigned for g14b and test area
- EPICS has some inter-subnet issues, clas_epics works on clon10; at least one HV board in NCS MF must be checked
- one camac crate need repair on FC - was repaired already by Sergey P.
- few TOF cables have broken connectors, Armen is working on
- fan units must be repaired, need about 70 fans, will investigate options; at least we can move working fans above SFIs
- TDC calib, TOF calib (maybe laser run), EC calib - need to put VXS crate instead of VME64X as ec3
- LAC have to be checked before we put it back to the system
- when ST connected, will check triggers including level2
- check devices in dump area (harp, tac etc)
- check helicity stuff
- trigger files are ready in g14b area
- new harp software needed
2. Test setups
- put discr/fadc scalers under EPICS - Nerses is working, Sergey B. will help, will be used by Hall D and HPS
- may need to connect Hall D crate (new TI) to clastrig2 branch, need to check with David Abbott how to do that
- will provide 1Gbit (69) and one 100BaseT (167) for Hall D
- will set clonpc3 for Hall B DAQ
- will set new rack-mounted servers to test setup DAQs (former bonuspc's) with RHEL6 32-bit
- HPS: chiller EPICS control (was on clonwin3); may reuse it or install LabView new version (will ask HDIce people - Chris Bass)
- HPS: will try to install 2 racks on 2nd deck of SF; need to connect 2 crates, so need 2 new TIs and configure them as master-slave couple