March 9, 2011 online meeting minutes

From CLONWiki
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, Nerses


1. Next run preparations (tager calib run and g14)

  • test run around March 26, g14 after April 3
  • new g14 directory on SILO
  • tage/tage2/tage3 preparations: 34-pin connectors in tage, CPUs for all three (Intel ?); translation table
  • LAC ADC/TDC check: pedestal run, tdc calib run
  • trigger: use new version, but old calib configurations must be created, and L2 fixed; tagger MOR bit needed (see G9NORM), and any 2 sector TOFxST, possible L2
  • polar will be needed for g14 - need to check TS end run problem (fixed ?)
  • new supply and 24-port blade to be installed in Big Iron router, all AC wiring to be redone to make sure both UPSs are equally loaded; remove italian farms in Counting House (not in use); clonfs2 can be moved to EEL; old raid - decommission or ELL ?
  • finish mac-mini installation in Hall


2. CLAS12 projects

  • 16 JLAB discriminators arrived, will test them and install in TOF big angle area instead of CAMAC crate with 7 2313s (add to DIMAN); second stage - make it ROC and read scalers
  • INFN visit (Andrea Celentano): CAEN v1720 FADC readout works, will send some hardware (PC with CODA, TI, v1190, mv6100) to INFN to be used in test setup
  • JLAB FADCs will be available around April, will be tested and used in ELL (Stepan) and CLAS (November in ST ?)
  • 4 intel-based VME controllers must arrive shortly, will be commissioned
  • EPICS: medm, edm, something else ??? archiving ???
  • racks layout - do something this summer ?