February 6, 2013 online meeting minutes

From CLONWiki
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov, Johann Goetz, Eugene Pasyuk

0. EPICS drivers: test setup was assembled on pie tower, crate ioctest1 contains motor drivers and motor itself connected to it. Johann will learn how to control motors, will ask Hovanes to help

1. CLAS12 construction: last 2 VME64X crates on FC were installed, Sergey P. doing inventory, will grant an access to the Fast Electronics Group; Chris's people will install sensors to VXS crates; 40 SD boards were moved back to electronics lab for firmware upgrade, next time it can be done remotely; labels were received and moved to TOF area (bldg.98) and being installed; steps for FC were ordered by Eugene; metal work underway on SF, computers will be shielded

2. DCRB test setup electronics installed in EEL room 125, tested with pulser, evio file written and delta function observed in tdc data; will be moved to the final location in the same room and connected to the region1 chamber in clean room 124; TOF test setup must be ready in a couple of weeks, may need more crates (1 extra VXS and 1 extra VME64X ?)