February 29, 2012 online meeting minutes
Jump to navigation
Jump to search
present: Sergey Boyarinov, Sergey Pozdnyakov, FX, Hovanes, Nerses, Somov
1. HPS preparations:
- 2 VXS crates installed in counting room, all boards in except 17 FADCs, CODA tests started; data will be in evio4 format
- recent evio4 and jevio4 sent to SLAC guys yesterday
- HV sy527-based boards for SVT: Nerses is working on it, will use VME and NIM from FT setup; 2 sy527 mainframes will be needed; hardware interlocks will be needed, some NIM boards will be required, need schematic to continue; motors control will be done by Hovanes and Nerses (wiring and IOC control); temperature sensors readout by Crister Bruhwel
- will try to have DAQ and HV control ready in a week
2. FCAL may need to run again