February 24, 2010 online meeting minutes
1. Helicity:
- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes instread, will check with Suleiman Raid); manual is in clonwiki; need to adjust our electronics to use MCC veto instead of ours; will take optic converter from Chris and install in Counting Room
- readout to be adjusted; may need non-reset scaler to count helicity strobs
- EPICS part to be adjusted (with Stepan and Chris)
2. Level 2
- 6U cage was installed in clastrig2, level2 electronics was moved to clastrig2, Ben is working to route sector-based level1 around TS2 directly to the Level2 latch, rewiring and tests scheduled preliminary for Friday February 26 (with Ed, Ben, Chris)
3.Other issues:
- need to cleanup logic in uppper camac crate (ask VPK); give pager to Chris
- 4 new monitors arrived, will be installed
- clonpc3 RHEL5 upgrade is in progress, ather PCs will follow
- full DAQ test - Monday March 1