December 12, 2012 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov
1. Cable labels discussed and decided except DC, to be discussed today; test board labels arrived, will test it; UPS temporary commected, all batteries discharged, will see if they will come back; 14 VXS crates arrived, stored in ESB, will move them to the Hall Monday; FADCs, TIs, TDs arriving, will be booked and installed; flash-based CODA in SVT test setup is working, will fix some details and produce new version
Ethernet fiber network was completed between Pie Tower and FC, 2 switches installed on FC level2 (167 subnet)
New budget estimate will be filled, will include manpower (Sergey P.) and 5 new HV mainframes, maybe some other missing items
DC-based trigger work has been started (Sergey B., Ben, Scott), will try to come up with something in a couple of month, then decision on new CTP can be made
Telefon on FC have to be fixed (replaced by cordless ?)