April 3, 2013 online meeting minutes

From CLONWiki
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov

1. CLAS12 installation: patch panel is under testing, remaining FADCs still to be moved to the hall; AC power work started on FC

2. Test setups: FTOF is running fine, Dan is working on calibration (HV is done, timing under way); TEDF building test setup to be rebuild in new location; ethernet wall socket 1A-PP1-19 was rerouted to subnet 86 by Brent, will test today and reconnect all network equipment; VXS crate with FADCs and other boards will be installed