March 27, 2019 online meeting minutes
present: Sergey, Stepan, Raffaella, vpk, Ben, Rafo, Eugene
1. RG-A run status
- running fine with some usual crashes, 14kHz
- problem with move2silo ...
- mmft1 procedure in the wiki now
- maybe create epics alarm on mmft1 busy with instructions how to recycle FTT low voltage; SEU monitor may report radiation problem, will talk to Oracle
- trigger validation data taken, cooked and skimmed, Andrea and Rafo are processing it; electron trigger rate is 2.7kHz with DC roads and match, contrast to 7kHz without it, validation process will confirm if it is correct reduction and we still efficient
2. HPS preparations
- electronics:
- trigger: all lab hardware installed, Ben is working on new trigger firmware, planning to get first version by April 15
- will prepare hodoscope simulation (2 PMTs with scintillator at window) to emulate trigger; should be ready by May 1 for Ben to start trigger testing on HPS setup
- run starts June 17, we'll try to be ready May 15