February 6, 2019 online meeting minutes

From CLONWiki
Revision as of 10:52, 6 February 2019 by Boiarino (talk | contribs)
Jump to navigation Jump to search

present: Sergey Boyarinov, vpk, Raffaella, Graham, Ben, Iordanka, Silvia, Eugene, Nathan, Stepan

Run preparations were discussed:

  • level3 and helicity correction: implemented, will be tested tomorrow
  • triggers will be ready with following running strategy:
  • trigger file 1: basic trigger (with new htcc !) without roads, all from Dec run is there including dc super layers multiplicity; data-based roads and dc-pcal geom match in tagging mode - random run 150Mevents for validation
  • trigger files 2,3: mc-based roads and gsim-based roads, road-pcal match, road-htcc match if ready - 2 validation runs against electron events, do not need random runs
  • decide on production trigger
  • multi-stream ER will be ready in case we need higher data rate (higher beam current possible
  • official run period name - 'rg-b', Sergey will fix cron jobs