October 18, 2017 online meeting minutes
present: Sergey
- CLAS12 Trigger
Remaining work in CLAS12 trigger system before Dec 4, 2017 run
==================================================
1. Hadrware:
- 17 VTP boards assembly and testing - Ben Raydo, Jeff Wilson
- 17 VTP boards installation (10-DC, 6-FTOF, 1-CND) - Ben Raydo, Sergey Boyarinov
- 17 VTP boards connection (Ethernet, serial, fibers) - Chris Cuevas, Armen Stepanyan, Mark Taylor
2. Firmware:
- ECAL: change from inner to total in cluster search - Sergey, Ben
- FT - Ben
- FTOF - Sergey, Ben
- stage2, stage 3 - Ben
3. Simulation:
- GEMC fadc mode1 digitization - Rafo
- stage 1 (except FT) - Sergey
- stage 1 (FT) - Andrea
- stage2, stage 3 - Rafo
- validation 1 (cosmic vs C++) - Sergey, Rafo
- validation 2 (GEMC vs C++ vs CLARA) - detector groups ? ( Cole, ..)
4. Configuration:
- trigger config files, configuration manual - Ben, Sergey
- DAQ configurations - Sergey
5. Monitoring:
- trigger results in data stream - Sergey
- histogramming, messaging, EPICS - ?
6. Cosmic commissioning - Ben, Sergey, Cole, ...
7. Beam commissioning plan (starting configuration, parameters to be changed etc) - Valery, ...