July 9, 2014 online meeting minutes
present: Sergey Boyarinov, Eugene Pasyuk, Bryan Moffit, David Abbott, Chao Peng, Xuefei Yan
PRAD DAQ:
- trigger fibers on SF, may install parcially with loop over pie tower
- 2(3) VME, 3 FASTBUS
- FASTBUS: 1881Ms need gate, will assumes that CIP is 12us fixed
- ask William about signal delay if do TI in and out from front panel, and block it by backend busy (ti jitter will be 16ns)