November 7, 2012 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk
- FC electronics installation is in progress: 28 racks are in place and equipped with support and cable trays, 2 new racks on level3 need new vertical rails; 16 VME64x and 6 VXS crates are moved to the FC levels, some installed, 7 power cables are missing for VME64x crates, working to resolve; 220V sockets must be replaced with 110V round shapes for VXS crates; detector cabling will start some time in April and take about 8 weeks; Brent Morris will prepare couple cisco switches for FC with 1GBit uplink; still waiting for electrical and ethernet wiring; etherlite32 will be installed; NIM crates should be here in a month; will try to finish FC electronics installation by the end of December in general; DAQ will be needed by summer 2013, will use hit-based trigger (v1495-based)
- barcode label samples were ordered for both cables and boards; db gui is ready - under testing
- Sergey B. attended EVIO meeting and presented evio dictionary example, it will be discussed and then all data banks will be described
- flash card for VME controllers need to be purchased, will be used in test setups