August 29, 2012 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov
- counting house was cleaned up; in room 102 all racks were moved to storage, waiting for the property to take excessed equipment (done !); in room 102A all racks and shelfs were cleaned up, some stuff trashed and other stored inside racks; after cleanup is finished counting room will be ready for renovation; few crates still have to be moved to the hall
- HV test setup will be reinstated on Pie Tower, need to restore 10G fiber patch panel disconnected during cleanup, and install new switch; still need to test 40 new boards, and patch panels; 2 more mainframes still in Fernando's lab, and one more to be received from CAEN
- GOOD cordless phone(s) needed in the hall (with headphones)
- 2 UPSes were moved from counting room to the hall (racks L1-17 and PI 2-2), request was placed to connect them to the emergency generator
- PR placed for scanner equipment