February 22, 2012 online meeting minutes

From CLONWiki
Revision as of 10:37, 22 February 2012 by 129.57.81.115 (talk) (Created page with "present: Sergey Boyarinov, Sergey Pozdnyakov, Hovanes, FX, Nerses 1. HPS preparations: * DAQ: 2 VXS crates installed in counting room, have 2 CPUs, 2 TIs, 2 CTPs (one old), 2 S...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov, Hovanes, FX, Nerses

1. HPS preparations:

  • DAQ: 2 VXS crates installed in counting room, have 2 CPUs, 2 TIs, 2 CTPs (one old), 2 SDs, 15 FADCs (one with bad channel); after finish with EVIO will connect everything and run tests taking pedestal runs etc
  • EVIO still not finished (mostly JEVIO), working hard ...
  • slow control: 1 vme crate with cpu and v288 (camac2 ?), initially in counting room using croctest2; will use primex setup to control motors (primexioc1 etc); may need windows machine to control chiller, will check ethernet and rdesktop, will ask Pawel Ambrozevich (FT test currently using it)
  • SVT internal sensors will be in data stream and must be in EPICS, even if DAQ is not runing (tcpserver ?)
  • need to analyze IC data in pulsed mode to make sure it works