February 1, 2012 online meeting minutes

From CLONWiki
Revision as of 10:33, 1 February 2012 by 129.57.81.115 (talk) (Created page with "present: Sergey Boyarinov, FX, Nerses, Sergey Pozdnyakov, Eugene Pasyuk, Alex Somov, Hovanes 1. test setups: * PCAL getting ready to take data, v1495-based trigger was modifie...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

present: Sergey Boyarinov, FX, Nerses, Sergey Pozdnyakov, Eugene Pasyuk, Alex Somov, Hovanes


1. test setups:

  • PCAL getting ready to take data, v1495-based trigger was modified (delays removed) to speedup processing
  • HPS is ready to take beam data as stand-alone system with JLAB FADCs, but need to readout 2v1190 TDCs (and maybe run with tage crates); will check how FADC offset effects discriminators; if we run with low PS field, tage is not necessary
  • FT is running fine
  • Hall D setup need to be run with tage crates, will try to insert old TI and leave new TID as FADC clock/trigger source only, this way we can run with CLAS DAQ and include all necessary CLAS crates


2. g14b run status: running fine in general, lost channel 33 (from 1) in TRGS bank - fixed (bad contact ?), have duplicate channel 47; ADB crate sector 3 reg 1 is turning itself off, Bill is fixing it; Andy requested to accumulate TESC and report in the end of the run, will try to do something during downtime in the end of February; clonhp2 need ink, and clonhp is broken