present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene, Hovanes, FX, Nerses
1. Flash ADCs: one crate with 16 FADCs, TID and SD was tested and works fine; will be moved to the Hall next week and connected to DVCS calorimeter; HPS test-related issue: writing speed to sfs61 need to be checked (100MB now, should be more); dump data from 2 areas to 2 different tapes, second tape for all tests including Hall D tests;
2. DCRB: new 9U VXS crate installed and configured as dc12, one dcrb board inside along with mv5100, TI, reset board and ecl-lvds converter, will connect it to DC reg. 3 and test everything
3. PCAL test setup: all electronics are installed, cables in production, need few more days to finish
CLAS12 online farm can be in computer center, will provide 10GBit link from counting room to computer center - preliminary discussed with Denis, Bryan Hess and Sandy