October 5, 2011 online meeting minutes

From CLONWiki
Revision as of 10:16, 5 October 2011 by 129.57.81.115 (talk)
Jump to navigation Jump to search

present: Sergey Boyarinov,

1. Cables in inventory database:

2. Electronics testing: FADC will be moved to the Hall for testing with real detectors; v1190/v1290 testing is under way

3. Drift Chamber cosmic test and upcoming run preparations: cables on the floor were repaired, DC1 was fixed, may need to repair FASTBUS WIENER power supply, ready to run DAQ