September 21, 2011 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk
1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies were studied, on first glance all dependencies are similar: linear and the same range: 550 in DAC registed gives about 4000, and 3500 gives about 0, plus/minus 100
2. PCAL trigger: