September 21, 2011 online meeting minutes

From CLONWiki
Revision as of 09:14, 21 September 2011 by 129.57.81.115 (talk) (Created page with "present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk 1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk

1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies were studied, on first glance all dependencies are similar: linear and the same range: 550 in DAC registed gives about 4000, and 3500 gives about 0, plus/minus 100

2. PCAL trigger: