February 23, 2011 online meeting minutes

From CLONWiki
Revision as of 11:08, 23 February 2011 by 129.57.81.115 (talk)
Jump to navigation Jump to search

present: Sergey Boyarinov, Eugene Pasyuk, Nerses, Sergey Pozdnyakov, Mark Kibilko, ...

1. Downtime work

  • tagger restoration - couple weeks; tage recabling; 3 VME cpu needed; tage HV restoration; translation table for tage
  • microstrip detectors - need to see if working and use for tage calibration; if does not work, will calibrate later using other microstrips (HPS SVT ?)
  • trigger for g14 (HDIce) run, need to test level2 with new trigger version, or use previous one
  • LabView-EPICS communication to be implemented (Chris Bass and Nerses)
  • LAC: half of ADCs shows garbage, need to fix; TDCs were never tested after PRIMEX2
  • no CC


2. CAEN visit

  • DC HV replacement was discussed, 944 fast trip was important, will discuss how to implement it in sy1527
  • sy1527 boards testing conditions were discussed, will set better cooling and use every other slot; max power per channel is 8W, for tests we'll limit it to 7W
  • calibration boards for sy1527 will arrive in few month, JLAB personal was trained for calibration and repairs
  • old sy527 system need new fans (6 big and one small) if we want to use them in a future