Counting House remodeling

From CLONWiki
Revision as of 15:26, 19 January 2011 by 129.57.81.115 (talk)
Jump to navigation Jump to search

Hall B requirements:

  • 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%)
  • 2nd floor: electronics test and storage area (10 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space, separate climate control