December 15, 2010 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov
1. TPE run status
- new trigger was commissioned and compared with old one, seems working, need to measure adc gate position; latch feature seems working, need to read it out and place to datastream
- Ben's trigger GUI is working; v1495 software was adjusted; EPICS scalers readout to be implemented
- DAQ was tuned; both rol2 and net are running on all available co-processors; 'parallel' rol1 is used everywhere; reached 4.6kHz at 86% livetime and beam current 140nA, limited by DC occupancy but DAQ limit is close as well; sc2 rol1 processing time is much bigger then others (see xxx); clastrig2 readout speed still to be studied
- RF signal dissapeards, Raffaella fixed it (bad unit, see logbook Dec 14 around 7pm), need to fix permanently
- last night 2 switches went down, CC want to replace the one on 96 subnet, should think about bethsw3sc; also, dc6pmc1 died and did not want to reboot
- two kind of ROC crashes were observed: ROLS_LOOP on host and PROC on PMCs; last one does not require reboot, cancel-reser-download-.. works, first one will try it; will try to reproduce and debug it over downtime (big buffer check function etc)
- TOF SCHV alarm did not work when all values (except EPICS demand values) went to zero; crate turned on but values stayed zero and it was no alarm which is correct; we do not know why values went down to zero; will ask Nerses to look