present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Eugene Pasyuk, McMollen, eng, Latifa, Ben Raydo, Glen, Nerses

1. SVT: VME or so readout board not covered, have to find group to design and produce it; will have a phone meeting with FNAL asap (Kwan)

2. TPE preparations

  • LAC TDCs/DISCR wired back
  • new TDCs and DISCR installed to EC4 and wired - for TPE cal and DFM
  • need scalers: Sergey P. daq ones, nerses epics ones
  • need HV
  • fastbus TAGE was removed, VME installed, need to check flat cables and cleanup everything; trans table must be changed
  • DC cosmic test needed - for Dc and level2 control check
  • level1 to be completed and test