June 9, 2010 online meeting minutes

From CLONWiki
Revision as of 08:27, 10 June 2010 by 129.57.76.146 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, Nerses Gevorgyan

  • level2 reset works; sometimes level2 alarm induced by low voltage failure or other problems, maybe need to modify message on alarm browser
  • dc hv: caenet send command delay was adjusted, will start from 20ms and increse 50ms every time we are trying again; tested in test setup, works fine, will be tested in the hall later
  • raid disk: upper unit power supplies (both) went down again, as result lower unit does not communicate now, Paul Letta will check it
  • clondaq2: yellow light, need service; ask Paul about server processor commands and update solaris wiki page; 10Gig link was lost, Bryan Hess touched connectors and replaced optic cable, works now
  • print problems were obsetved on some clons, need check
  • l2_status_dead probably must be removed from cronjob, since we have alarm from the dccntrl crate's process; error (DISPLAY not set for cron jobs,tcl's wish seems want it) in log file must be addressed in any case

Other issues:

  • linear fanouts: philips about $1000, will buy, including for SCU
  • have 5 spare CAMAC power supplies now (3 repaired, 2 found)
  • Nerses is working on harp scan issues on intel solaris, will be fixed soon; histo solid filling in 'medm' works on sparc solaris only, will be addressed as well