February 10, 2010 online meeting minutes

From CLONWiki
Revision as of 10:53, 10 February 2010 by 129.57.76.146 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

present: Sergey Boyarinov, Eugene Pasyuk, Sergey Pozdnyakov

1. FANUC VME Intel-based controller was installed in mini-vme crate and configured as croctest3. It runs RHEL5 installed by Bryan Moffit. Using Bryan's readout lists and library samples CLAS DAQ was adjusted. We were able to run dummy readout list (TI board only, no other boards in the crate) in polling mode, interrupt mode is under testing. Bryan is working to adjust v1190/v1290 readout. Will try to integrate FANUC into CLAS DAQ before next run and probably try to use it then.

2. During next few days OS will be upgraded on most clon machines. Solaris patches will be installed, and Linux machines will be upgraded to RHEL5. New machines clonmon0 and clonmon2 will be installed, and corresponding software will be moved from clon00 and clon04.


Other items:

After that will start next run preparation starting from helicity and level2 check, and then new trigger using photon GUI.

Fast reconstruction will be needed, must check. Two versions may be needed: 6 out of 6 and 5 out of 6.

Problem with pagers must be resolved.