present:

1.СLAS12 trigger: following equipment needed for the CLAS12 trigger system:

  • CTP (Crate Trigger Processor): 19+1
  • TI (Trigger Interface): 19+1
  • signal distribution module: 19+1
  • SSP (Subsystem processor): 6+1
  • GTP (Global Trigger processor): 1+1
  • ADB backplanes: 18+1
  • MUX boards: 252+3
  • VXS crate: 1+1 (18 crates are included into FADC system)

.... Optional equipment:

  • SFP (segment finder processor): 18+1
  • RFP (road finder processor): 6+1 (can be combined with SSP - to be decided)

Updated documents will be prepared by Sergey B. before July 8 workshop.