February 18, 2009 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov,
1. eg2dvcs run status
- clon10 68 subnet (bge1) port broke, 68 was moved to bge2, 69 was removed; will reboot and contact SUN if necessary;
v1190 reflashed
- new BIGIRON installed, Greg reported sone scan-related problems, clonpc3 will be used to debug
- mv6100 BSP had a 'bug': DMA was finishing with interrupts, it cause sc2 crashes on high rate; was commented out
on Dave's advise and it works now
- bethsw1 lost 3 (at least) ports, power recycle helped; all 3 were connected to terminal servers
- event rate 5-6 kHz and fluctuates because of rastering
- raster is in data stream (FBPM), will be in epics; daq has alarm on raster on/off (clon_pr)
2. Projects
- classc5 running new epics, classc12 to do including minitorus power supply control over serial line
- Lecroy HV mainframes: 3 came from repair, 2 works, 1 to be tested
- Lecroy HV modules: have enough spares, and the number of broken, but will not repair unless necessary
- CEAN SY1527: HVDVCS in CAEN, repair under way; HVEC2 drawer in CAEN, under way; SY1527 from Yuri with one module