January 21, 2009 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan
1. Current run status
HV system
- in CLAS everything works for now
- there are good spare boards: 1461N - 9 boards, 1461P - 2 boards
- there is no good spare Lecroy mainframes; 2 in repair since November 2008, 1 from July 2008, waiting for status; 3 in Counting House, repair needed, RMA under way;
there is one Lecroy mainframe (temporary rack in EC), can be replaced with sy1527 (from Yuri ?) so we'll have 1 spare mainframe and 8 1461N boards, will do it after the run
- two SY1527LC mainframes with problems have to be repaired in CAEN, will send them one by one starting from ECHV2 where TCP/IP broken as well
- will be good to modify medm gui generating process to have geographic addressing information in gui