September 17, 2008 online meeting minutes
present: Sergey Boyarinov, Valery Kubarovsky, Sergey Pozdnyakov
- dvcs trigger
racks will be in final destination today all discriminators have test inputs connected ( 6 groups 5-6 boards each), signals looks fine
- adcs/tdcs/scalers
mini-VME64X borrowed from Chris and installed in the rack with splitters; mvme6100 CPU, TI and 4 v1190 TDC boards are installed