October 3, 2007 online meeting minutes
DVCS Trigger System
Projects
- PCAL (works, +5V fixed, signal distr board replaced, 1 sec delay introduced in 'go' to fix hunging; Stepan asked about
10times better ADC resolution - >2Gsample card ???)
- TI in PCI - may need it again, remind Ed
- Active collimator needed in DAQ - probably
- Wolfram (works, ROOT too slow and will be addressed during upcoming run preparations (select function, control worls bit by EB ???))
- Lecroy repairs, sy527 AC connectors replacement (will Chris)
- PrPMC880 replacement
- Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform;
Carl still working on ET modifications, tests to be started dayli, new version expected in about a week, we'll wait, do modifications and then run full CLAS DAQ test; new EPICS channels from target
TODO:
- sy1527: reboot button, reconnect after hardware reboot
- sy527 support (similar to sy1527 but in VME crate because of VME CAENAT board v288)
- v1190/v1290 extensive testing (CBLT, slot#, install mv6100 in the hall and switch to 2eSST)
- DVCS Trigger Development
- Hall B electronics inventarization
- Upcoming run preparations on requests (fix flip-related problem in online delay reporting correction procedure, ..)
- probably Hall D test in Hall B - next summer