October 3, 2007 online meeting minutes
DVCS Trigger System
Projects
- PCAL
- Wolfram
- Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform;
Carl still working on ET modifications, tests to be started dayli, new version expected in about a week, we'll wait, do modifications and then run full CLAS DAQ test
TODO:
- sy527 support (similar to sy1527 but in VME crate because of VME CAENAT board v288)
- v1190/v1290 extensive testing (CBLT, slot#, install mv6100 in the hall and switch to 2eSST)
- DVCS Trigger Development
- Upcoming run preparations on requests (fix flip-related problem in online delay reporting correction procedure, ..)