November 8, 2017 online meeting minutes
present: Sergey Boyarinov
1. CLAS12 trigger
- hardware: all trigger components installed (?)
- cabling: all fibers and ethernet/serial cables are installed (?)
- software: stage1 trigger software (ECAL/PCAL/HTCC/FTOF) passed to Rafo for testing, work in progress to establish reliable procedure to produce GEMC files in appropriate format; stage2/3 modeling still due
2. DAQ preparations
- CTOF/CND test run: local daq was organized with adcctof1 as master and tdcctof1 and adccnd1 as slaves, triggering from SD boards as 'OR' of all FADCs, data for CTOF was taken and looks good, CND cabling finished last night and will be tested today; test run associated with solenoid turn-on will be conducted today around 3pm
- TDC calibration: waiting for Andrey Kim to analyze data taken from tdcftof2 crate and decide if data good enough for calibration
- scalers: we decided to have designated scaler crate, so crate scaler1 was installed on pie tower, connected to ethernel and fibers, Bryan Moffit is working on Intel-based library for sis3801 scalers
- clondaq3 and clondaq5 were converted to RHEL7, configuration in progress