February 17, 2016 online meeting minutes
present: Sergey, Ben, Cole, Vladimir Popov
1. Discussed how to connect neutron detectors to dsc2, Vladimir will modify detector electronics to provide signals over coax cable
2. ECAL trigger
Sergey prepared first revision of modeling program in c/c++; it can read ccdb (which was installed on clon machines)
for ecstrips() we'll use pulse_min as pedestal (e0 in ecstrips) taking nsa and nsb from data; time will be converted to 4ns ticks
cable difference time will be ignored; timing after propagation correction should help matching
coord system will be sector-based
how many clusters to keep - make it parameter