Counting House remodeling
Hall B requirements:
- 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%)
- 2nd floor: electronics test and storage area (10 racks, table for soldering, electronics cabinets, shelfs for boxes), glass wall between racks and the rest of space, separate climate control