November 12, 2008 online meeting minutes

From CLONWiki
Revision as of 10:18, 12 November 2008 by Boiarino (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses

1. Run DVCS2 in production mode, event rate 2.5kHz, dead time 5%, beam current 12nA; test was done on 18nA, DAQ was running fine; both triggers were commissioned (CLASTRIG2 and DVCSTRIG), dvcs2 crate with v1190 TDCs for IC and SH works fine, all timing including ADC gate was checked; EC1 HV Lecroy crate was replaced with CAEN sy1527, it works fine, we'll continue replacement during downtimes

2. Plans