November 12, 2008 online meeting minutes
present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses
1. Run DVCS2 in production mode, event rate 2.5kHz, dead time 5%, beam current 12nA; test was done on 18nA, DAQ was running fine; both triggers were commissioned (CLASTRIG2 and DVCSTRIG), dvcs2 crate with v1190 TDCs for IC and SH works fine, all timing including ADC gate was checked; EC1 HV Lecroy crate was replaced with CAEN sy1527, it works fine, we'll continue replacement during downtimes
2. Plans