October 24, 2007 online meeting minutes
present: Sergey Boyarinov, Eugene Pasyuk, Sergey Pozdnyakov
mainframes:
- one Lecroy arrived from repair, under testing in the test setup, works so far; Lei will install it instead of EC #4, which will be tested in test setup and decision will be made on possible repair
- 6-ch HV boards arrived from repair, works, installed instead of 12-ch (beam line devices)
epics:
- Nerses if making preparations in epics to switch to the sy1527 from Lecroy if needed
- some problems were observed related to the bigsubRecord implementation, works now but need to be understood
- Hallsystems works for LAC, incorporated into ioc restart GUI, still need UNIX version
- alarm screens - works now ?
fast reconstruction:
- Franz made several G9A-specific histograms
- need to fix photon run particle ID part - Sergey is working (it was used to the long time to reconstruct electrons only)
other:
- counting house cleanup was performed, exsessing in progress
- Eugene is fixing EPICS variables list; cron job control needed (cdev -> ca, -9999. will be monitored)