January 4, 2012 online meeting minutes
present: Sergey Boyarinov, Sergey Boyarinov, Nerses, Franz klein, Eugene Pasyuk, Zhiwen Zhao, Hovanes, FX, Alex Somov
1. test setups: end of february - begining of march will be downtime, can be used to install setups in the hall
- halla's shashlik for SoLID spectrometer: 30 channels, not early then March; need tagger, but will start from standalone setup; Hall B will provide electronics if necessary (2 FADCs, 2 TDCs, 2 discr, VME64X crate, FADC fanout, old TI, cpu)
- halld: will need few hours with tagger, will try to modify new TI to work with old TS (already in progress for IC)
- IC: ready to connect to FADCs and v1190s; have to deal with positive offset from FADCs; need data translation to reproduce the same mapping and compare with FASTBUS data taken before
- pcal: will start to configure after IC is done
- FT setup need some modifications
2. g14b run status: 2012 problem fixed in logbook; new trigger (2 sec bit 1 and 1 sec with L2 bit 2) is ready, need to be tested; Franz found that HLS reporting seems Ok, will look again to make sure