Counting House remodeling

From CLONWiki
Revision as of 15:46, 19 January 2011 by 129.57.81.115 (talk)
Jump to navigation Jump to search

Hall B requirements:

  • 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%); replace small round lamps which are failing all the time
  • 2nd floor: electronics test and storage area (5-8 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space with separate climate control for two areas; emergency AC power (similar to room 102)