Counting House remodeling

From CLONWiki
Revision as of 15:29, 19 January 2011 by 129.57.81.115 (talk)
Jump to navigation Jump to search

Hall B requirements:

  • 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%)
  • 2nd floor: electronics test and storage area (10 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space with separate climate control for two areas