February 24, 2010 online meeting minutes

From CLONWiki
Revision as of 11:46, 25 February 2010 by 98.166.92.51 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

1. Helicity:

- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes instread, will check with Suleiman Raid); manual is in clonwiki; need to adjust our electronics to use MCC veto instead of ours; will take optic converter from Chris and install in Counting Room

- readout to be adjusted; may need non-reset scaler to count helicity strobs

- EPICS part to be adjusted (with Stepan and Chris)

2. Level 2

- 6U cage was installed in clastrig2, level2 electronics was moved to clastrig2, Ben is working to route sector-based level1 around TS2 directly to the Level2 latch, rewiring and tests scheduled preliminary for Friday February 26 (with Ed, Ben, Chris)

3.Other issues:

- need to cleanup logic in uppper camac crate (ask VPK); give pager to Chris

- 4 new monitors arrived, will be installed

- clonpc3 RHEL5 upgrade is in progress, ather PCs will follow

- full DAQ test - Monday March 1