Revision as of 09:50, 16 October 2019
present: Sergey Boyarinov, Yuri Gotra, Stepan, oayette, Madhusudah, mhattawy, ben raydo, francesco, nathan
1. BONUS preparations:
- new MM readout firmware and new rol1/rol2 versions were installed by Irakli and tested along with SVT using cosmic data; Yuri Gotra was running day and monitoring data quality; new firmware/software seems works as expected; will do beam test, and then do change permanent
- Chris Cuevas email: "I have no new news on the BoNUS12 "Adapter" boards and time is becoming worrisome. The flex board vendor has had trouble manufacturing these boards, but the assembly is not difficult so once the new batch of bare flex boards arrive at the vendor, the assembly can be expedited"
2. Upcoming run:
- helicity flip rate will be 120Hz, 90us t-settle (dead time during flip); hardware correction board needed, or improved correction procedure; since time is short, software solution have to be pushed; Sergey will work on that
- new fileserver, clon10 and switches in the hall are in process of installation and commissioning
- RF board not reset every run
- beam structure control is in progress of designing
- new EB version is ready to decrease memory usage, under testing
- v288's in one crate - next summer
- FADCs for HDIce shows problems, Ed is investigating
- run. start Nov 25, but maybe early (Nov 22, or even early)
- classc1 loaded with new vxWorks kernel with bigger amount of file descriptors, did not help, will investigate