October 2, 2019 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
Created page with "present: Sergey Boyarinov 1. HDICE daq & trigger 2. SVT/MM cosmic test 3. Clon cluster upgrades and upcoming run preparations"
 
Boiarino (talk | contribs)
No edit summary
Line 1: Line 1:
present: Sergey Boyarinov
present: Sergey Boyarinov, Nathan, Chris Cuevas, Stepan


1. HDICE daq & trigger
1. HDICE daq & trigger: test1 VME64X crate was moved from EEL/125 to test lab beam enclosure, 5 FADCs installed and firmware upgraded; network switch installed with 86 subnet; DAQ is running with HDICE7 configuration; detector is not there yet; need some trigger - OR or something more complex


2. SVT/MM cosmic test
2. SVT/MM cosmic test: gas is flowing,  will be ready to run cosmic soon; readout boards for TPC still not ready


3. Clon cluster upgrades and upcoming run preparations
3. Clon cluster upgrades and upcoming run preparations: CC installing 5 new switches on FC to replace edging ones, fileserver shipped and will be here soon; helicity correction board will be good to have if exist; integrated data rate counter in runcontrol fixed; HV reset boards installation is in progress; new RF board have a problem reseting every run, have to fix it somehow, for example init on power-up so it can be in crate without cpu and without control; beam modulation effect discovered in HPS have to be controlled somehow

Revision as of 09:34, 2 October 2019

present: Sergey Boyarinov, Nathan, Chris Cuevas, Stepan

1. HDICE daq & trigger: test1 VME64X crate was moved from EEL/125 to test lab beam enclosure, 5 FADCs installed and firmware upgraded; network switch installed with 86 subnet; DAQ is running with HDICE7 configuration; detector is not there yet; need some trigger - OR or something more complex

2. SVT/MM cosmic test: gas is flowing, will be ready to run cosmic soon; readout boards for TPC still not ready

3. Clon cluster upgrades and upcoming run preparations: CC installing 5 new switches on FC to replace edging ones, fileserver shipped and will be here soon; helicity correction board will be good to have if exist; integrated data rate counter in runcontrol fixed; HV reset boards installation is in progress; new RF board have a problem reseting every run, have to fix it somehow, for example init on power-up so it can be in crate without cpu and without control; beam modulation effect discovered in HPS have to be controlled somehow