February 6, 2019 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
Created page with "present: Sergey Boyarinov, vpk, Raffaella, Graham, Ben, Iordanka, Silvia, Eugene, Nathan, Stepan 1. Run preparations * level3 and helicity correction: implemented, will be t..."
 
Boiarino (talk | contribs)
No edit summary
Line 7: Line 7:
* trigger changes:  
* trigger changes:  


  trigger file 1: basic trigger (with new htcc !) without roads, all the rest is there including dc super layers multiplicity; data-based roads in tagging mode - random run 150Mevents for validation
  trigger file 1: basic trigger (with new htcc !) without roads, all from Dec run is there including dc super layers multiplicity; data-based roads and dc-pcal geom match in tagging mode - random run 150Mevents for validation


  trigger files 2,3: mc-based roads and grim-based roads, road-pcal match, road-htcc match if ready - 3 validation runs
  trigger files 2,3: mc-based roads and gsim-based roads, road-pcal match, road-htcc match if ready - 2 validation runs against electron events, do not need random runs


  decide on production trigger
  decide on production trigger
multi-stream ER will be ready in case we need higher data rate (higher beam current possible
official run period name - 'rg-b'

Revision as of 10:40, 6 February 2019

present: Sergey Boyarinov, vpk, Raffaella, Graham, Ben, Iordanka, Silvia, Eugene, Nathan, Stepan

1. Run preparations

  • level3 and helicity correction: implemented, will be tested tomorrow
  • trigger changes:
trigger file 1: basic trigger (with new htcc !) without roads, all from Dec run is there including dc super layers multiplicity; data-based roads and dc-pcal geom match in tagging mode - random run 150Mevents for validation
trigger files 2,3: mc-based roads and gsim-based roads, road-pcal match, road-htcc match if ready - 2 validation runs against electron events, do not need random runs
decide on production trigger
multi-stream ER will be ready in case we need higher data rate (higher beam current possible
official run period name - 'rg-b'