present: Sergey Boyarinov
present: Sergey Boyarinov, Chris, Ben, Valery, Cole, Rafo, Stepan, Nathan


1. CLAS12 trigger
1. CLAS12 trigger


* hardware
* hardware: fiber transceivers installed 'almost' everywhere; fibers installation in process, last order to be arrived this week; equal sec4 tdc cable missing; FTOF VTPs still in repair, will goto FTOF, others can be installed right now


* cabling
* cabling - see above


* software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file
* software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file
Line 13: Line 13:


contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check
contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check
- PCAL strip threshold will be applied once - Coles picture; maybe make all strips double ? may have space for mip trigger (up and low threshold for every hit energy, or maybe make ftof send info directly to pcal on stage 1)
- Andrea sent email with lookup tables for stage 2;


2. DAQ preparations
2. DAQ preparations

Revision as of 09:32, 1 November 2017

present: Sergey Boyarinov, Chris, Ben, Valery, Cole, Rafo, Stepan, Nathan

1. CLAS12 trigger

  • hardware: fiber transceivers installed 'almost' everywhere; fibers installation in process, last order to be arrived this week; equal sec4 tdc cable missing; FTOF VTPs still in repair, will goto FTOF, others can be installed right now
  • cabling - see above
  • software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file
/work/boiarino/data/TCS_1_AllTrig_Detectors.evio_out.0
/work/boiarino/data/TCS_2_AllTrig_Detectors.evio_out.0

contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check

- PCAL strip threshold will be applied once - Coles picture; maybe make all strips double ? may have space for mip trigger (up and low threshold for every hit energy, or maybe make ftof send info directly to pcal on stage 1)

- Andrea sent email with lookup tables for stage 2;


2. DAQ preparations

  • TDC calibration: "noise" generator installed and connected to discriminators's test inputs in tdcftof2 crate, first run data taken, will be analyzed (andrey Kim); tdc1290 library was updated, it has all necessary functions to upload/download/control compensation table and tic chip internal delay adjustments
  • scalers: 2 struck scalers installed in trig2 crate along with optic-nom converter; helicity optical signals from MCC were fined-out in counting room and sent to two locations in the hall: SF level1 north and pie tower; all electronics will be checked, and scalers readout will be added to day