Line 1: | Line 1: | ||
present: Sergey Boyarinov | present: Sergey Boyarinov, Chris, Ben, Valery, Cole, Rafo, Stepan, Nathan | ||
1. CLAS12 trigger | 1. CLAS12 trigger | ||
* hardware | * hardware: fiber transceivers installed 'almost' everywhere; fibers installation in process, last order to be arrived this week; equal sec4 tdc cable missing; FTOF VTPs still in repair, will goto FTOF, others can be installed right now | ||
* cabling | * cabling - see above | ||
* software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file | * software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file | ||
Line 13: | Line 13: | ||
contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check | contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check | ||
- PCAL strip threshold will be applied once - Coles picture; maybe make all strips double ? may have space for mip trigger (up and low threshold for every hit energy, or maybe make ftof send info directly to pcal on stage 1) | |||
- Andrea sent email with lookup tables for stage 2; | |||
2. DAQ preparations | 2. DAQ preparations |
Revision as of 09:32, 1 November 2017
present: Sergey Boyarinov, Chris, Ben, Valery, Cole, Rafo, Stepan, Nathan
1. CLAS12 trigger
- hardware: fiber transceivers installed 'almost' everywhere; fibers installation in process, last order to be arrived this week; equal sec4 tdc cable missing; FTOF VTPs still in repair, will goto FTOF, others can be installed right now
- cabling - see above
- software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file
/work/boiarino/data/TCS_1_AllTrig_Detectors.evio_out.0 /work/boiarino/data/TCS_2_AllTrig_Detectors.evio_out.0
contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check
- PCAL strip threshold will be applied once - Coles picture; maybe make all strips double ? may have space for mip trigger (up and low threshold for every hit energy, or maybe make ftof send info directly to pcal on stage 1)
- Andrea sent email with lookup tables for stage 2;
2. DAQ preparations
- TDC calibration: "noise" generator installed and connected to discriminators's test inputs in tdcftof2 crate, first run data taken, will be analyzed (andrey Kim); tdc1290 library was updated, it has all necessary functions to upload/download/control compensation table and tic chip internal delay adjustments
- scalers: 2 struck scalers installed in trig2 crate along with optic-nom converter; helicity optical signals from MCC were fined-out in counting room and sent to two locations in the hall: SF level1 north and pie tower; all electronics will be checked, and scalers readout will be added to day