Created page with "present: Sergey Boyarinov 1. CLAS12 trigger * hardware * cabling * software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will..." |
No edit summary |
||
Line 7: | Line 7: | ||
* cabling | * cabling | ||
* software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project | * software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file | ||
/work/boiarino/data/TCS_1_AllTrig_Detectors.evio_out.0 | |||
contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check | |||
2. DAQ preparations | 2. DAQ preparations |
Revision as of 08:33, 1 November 2017
present: Sergey Boyarinov
1. CLAS12 trigger
- hardware
- cabling
- software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file
/work/boiarino/data/TCS_1_AllTrig_Detectors.evio_out.0
contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check
2. DAQ preparations
- TDC calibration: "noise" generator installed and connected to discriminators's test inputs in tdcftof2 crate, first run data taken, will be analyzed (andrey Kim); tdc1290 library was updated, it has all necessary functions to upload/download/control compensation table and tic chip internal delay adjustments
- scalers: 2 struck scalers installed in trig2 crate along with optic-nom converter; helicity optical signals from MCC were fined-out in counting room and sent to two locations in the hall: SF level1 north and pie tower; all electronics will be checked, and scalers readout will be added to day