Created page with "present: Sergey Boyarinov 1. CLAS12 trigger * hardware * cabling * software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will..."
 
Boiarino (talk | contribs)
No edit summary
Line 7: Line 7:
* cabling
* cabling


* software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project
* software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file


/work/boiarino/data/TCS_1_AllTrig_Detectors.evio_out.0
contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check


2. DAQ preparations
2. DAQ preparations

Revision as of 08:33, 1 November 2017

present: Sergey Boyarinov

1. CLAS12 trigger

  • hardware
  • cabling
  • software: FTOF trigger C++ and firmware just finished, will be tested; CTOF and CND cosmic trigger will be added to FTOF project; two GEMC files were preliminary processed through trigger C++ implementation with ECAL, PCAL, HTCC and FTOF turned on, file
/work/boiarino/data/TCS_1_AllTrig_Detectors.evio_out.0

contains trigger banks (39 events) and should be used to develop and check trigger banks conversion from evil to hip format, and for monitoring tools check

2. DAQ preparations

  • TDC calibration: "noise" generator installed and connected to discriminators's test inputs in tdcftof2 crate, first run data taken, will be analyzed (andrey Kim); tdc1290 library was updated, it has all necessary functions to upload/download/control compensation table and tic chip internal delay adjustments
  • scalers: 2 struck scalers installed in trig2 crate along with optic-nom converter; helicity optical signals from MCC were fined-out in counting room and sent to two locations in the hall: SF level1 north and pie tower; all electronics will be checked, and scalers readout will be added to day