February 5, 2014 online meeting minutes: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
|  Created page with "present: Sergey Boyarinov, Eugene Pasyuk, Chris Cuevas, Ben Raydo  1. CLAS12 installation progress  *   2. DCRB plans  3. HPS preparations" | No edit summary | ||
| Line 3: | Line 3: | ||
| 1. CLAS12 installation progress | 1. CLAS12 installation progress | ||
| *   | * in progress, will take another couple of month; Chris will arrange trigger fibers installation on FC, and SF will wait | ||
| 3. HPS preparations | 2. DCRB plans:  | ||
| * we are promised 400k, will build all dcrb boards and use remaining money for at least 6 VMS crates; need to do 6U version of dcrb board | |||
| 3. HPS preparations   | |||
| * hps1 and hps2 crates were installed on forward carriage with CPUs, TIs, FADCs abd SDs; Ben will put GTPs and SSP in and start developing soon; those 2 crates may be moved to alcove for actual run or stay on FC; atca crate will be on pie tower, as well as HV mainframes and LV; discr/TDCs (if used) will be on alcove together with splitters; will decide it based on cables available | |||
Revision as of 11:43, 5 February 2014
present: Sergey Boyarinov, Eugene Pasyuk, Chris Cuevas, Ben Raydo
1. CLAS12 installation progress
- in progress, will take another couple of month; Chris will arrange trigger fibers installation on FC, and SF will wait
2. DCRB plans: 
- we are promised 400k, will build all dcrb boards and use remaining money for at least 6 VMS crates; need to do 6U version of dcrb board
3. HPS preparations 
- hps1 and hps2 crates were installed on forward carriage with CPUs, TIs, FADCs abd SDs; Ben will put GTPs and SSP in and start developing soon; those 2 crates may be moved to alcove for actual run or stay on FC; atca crate will be on pie tower, as well as HV mainframes and LV; discr/TDCs (if used) will be on alcove together with splitters; will decide it based on cables available