February 5, 2014 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Created page with "present: Sergey Boyarinov, Eugene Pasyuk, Chris Cuevas, Ben Raydo 1. CLAS12 installation progress * 2. DCRB plans 3. HPS preparations"
 
No edit summary
Line 3: Line 3:
1. CLAS12 installation progress
1. CLAS12 installation progress


*  
* in progress, will take another couple of month; Chris will arrange trigger fibers installation on FC, and SF will wait


2. DCRB plans


3. HPS preparations
2. DCRB plans:
 
* we are promised 400k, will build all dcrb boards and use remaining money for at least 6 VMS crates; need to do 6U version of dcrb board
 
 
3. HPS preparations  
 
* hps1 and hps2 crates were installed on forward carriage with CPUs, TIs, FADCs abd SDs; Ben will put GTPs and SSP in and start developing soon; those 2 crates may be moved to alcove for actual run or stay on FC; atca crate will be on pie tower, as well as HV mainframes and LV; discr/TDCs (if used) will be on alcove together with splitters; will decide it based on cables available

Revision as of 10:43, 5 February 2014

present: Sergey Boyarinov, Eugene Pasyuk, Chris Cuevas, Ben Raydo

1. CLAS12 installation progress

  • in progress, will take another couple of month; Chris will arrange trigger fibers installation on FC, and SF will wait


2. DCRB plans:

  • we are promised 400k, will build all dcrb boards and use remaining money for at least 6 VMS crates; need to do 6U version of dcrb board


3. HPS preparations

  • hps1 and hps2 crates were installed on forward carriage with CPUs, TIs, FADCs abd SDs; Ben will put GTPs and SSP in and start developing soon; those 2 crates may be moved to alcove for actual run or stay on FC; atca crate will be on pie tower, as well as HV mainframes and LV; discr/TDCs (if used) will be on alcove together with splitters; will decide it based on cables available