Created page with "present: Sergey Boyarinov, Sergey Pozdnyakov 1. g14b: run started week ago, following problems were fixed: * level2 cables connected under the CLAS * several above-FASTBUS fan..."
 
No edit summary
Line 11: Line 11:
* rate was 4 kHz at 85% livetime at 20nA beam current BEFORE level2 fixes, expecting improvements
* rate was 4 kHz at 85% livetime at 20nA beam current BEFORE level2 fixes, expecting improvements


* remaining problems
* cmon works in electroproduction mode, see target; will calibrate and switch to photoproduction
 
* DC noise problem was investigated, Mac found and removed aluminum foil inside region 1, hopefully it will help
 
* remaining problems: SLM signel was broken - fixed, Moller should work;
 
 
2. Test setups:
 
* Hall D setup works, including silo part; must be ready to add tage and tage2 later
 
* HPS: ic is installed, connected to old ADCs, IP pedestal procedure works, FX looking at them; JLAB discriminators were installed (16 CLAS, 12 from Hall D), all software is ready to program them; FADCs are installed but not connected; trigger part must be restored (will try to do it in couple of days) and read IC out with CLAS but havinf separate trigger bit from IC

Revision as of 10:27, 30 November 2011

present: Sergey Boyarinov, Sergey Pozdnyakov

1. g14b: run started week ago, following problems were fixed:

  • level2 cables connected under the CLAS
  • several above-FASTBUS fans replaced, will continue
  • several CPUs replaced because of PMC failures
  • rate was 4 kHz at 85% livetime at 20nA beam current BEFORE level2 fixes, expecting improvements
  • cmon works in electroproduction mode, see target; will calibrate and switch to photoproduction
  • DC noise problem was investigated, Mac found and removed aluminum foil inside region 1, hopefully it will help
  • remaining problems: SLM signel was broken - fixed, Moller should work;


2. Test setups:

  • Hall D setup works, including silo part; must be ready to add tage and tage2 later
  • HPS: ic is installed, connected to old ADCs, IP pedestal procedure works, FX looking at them; JLAB discriminators were installed (16 CLAS, 12 from Hall D), all software is ready to program them; FADCs are installed but not connected; trigger part must be restored (will try to do it in couple of days) and read IC out with CLAS but havinf separate trigger bit from IC