October 5, 2011 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Created page with "present: Sergey Boyarinov, 1. Cables in inventory database 2. Electronics testing 3. Drift Chamber cosmic test and upcoming run preparations"
 
No edit summary
Line 1: Line 1:
present: Sergey Boyarinov,  
present: Sergey Boyarinov,  


1. Cables in inventory database
1. Cables in inventory database:


2. Electronics testing
2. Electronics testing: FADC will be moved to the Hall for testing with real detectors; v1190/v1290 testing is under way


3. Drift Chamber cosmic test and upcoming run preparations
3. Drift Chamber cosmic test and upcoming run preparations: cables on the floor were repaired, DC1 was fixed, may need to repair FASTBUS WIENER power supply, ready to run DAQ

Revision as of 10:16, 5 October 2011

present: Sergey Boyarinov,

1. Cables in inventory database:

2. Electronics testing: FADC will be moved to the Hall for testing with real detectors; v1190/v1290 testing is under way

3. Drift Chamber cosmic test and upcoming run preparations: cables on the floor were repaired, DC1 was fixed, may need to repair FASTBUS WIENER power supply, ready to run DAQ