September 28, 2011 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
1. Electronics testing: first FADC250 test results can be found on [[JLAB FADC250]], will continue in the Hall, will be installed instead of Struck FADC (will be connected to EC); Alex will test playback mode; more boards are expected | 1. Electronics testing: first FADC250 test results can be found on [[JLAB FADC250]], will continue in the Hall, will be installed instead of Struck FADC (will be connected to EC); Alex will test playback mode; more boards are expected, but time is unclear | ||
v1190/1290 testing shows some problems related to JLAB FANIO, still under investigation | |||
2. Drift Chamber cosmic: need to repair cables on the floor (Sergey P. will arrange it) | |||
3. CLAS12 data format: | |||
3. CLAS12 data format: Hall D has EVIO and HDDM, Hall B will try to use EVIO everywhere, it wil be discussed with offline community |
Revision as of 09:34, 28 September 2011
present: Sergey Boyarinov, Eugene Pasyuk, Sergey Pozdnyakov, Alex Somov, Hovanes
1. Electronics testing: first FADC250 test results can be found on JLAB FADC250, will continue in the Hall, will be installed instead of Struck FADC (will be connected to EC); Alex will test playback mode; more boards are expected, but time is unclear
v1190/1290 testing shows some problems related to JLAB FANIO, still under investigation
2. Drift Chamber cosmic: need to repair cables on the floor (Sergey P. will arrange it)
3. CLAS12 data format: Hall D has EVIO and HDDM, Hall B will try to use EVIO everywhere, it wil be discussed with offline community