February 23, 2011 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 20: Line 20:
* DC HV replacement was discussed, 944 fast trip was important, will discuss how to implement it in sy1527
* DC HV replacement was discussed, 944 fast trip was important, will discuss how to implement it in sy1527


* sy1527 boards testing conditions were discussed, will set better cooling and use every other slot; max power per channel is 8W, for tests we'll limit it to 7W
* sy1527 boards testing conditions were discussed, will set better cooling and use every other slot; max power per channel is 8W, for tests we'll limit it to 7W and run 48 hours; also it is good to go up and down every hour


* calibration boards for sy1527 will arrive in few month, JLAB personal was trained for calibration and repairs
* calibration boards for sy1527 will arrive in few month, JLAB personal was trained for calibration and repairs; we have spare channels and DC converter and fuses


* old sy527 system need new fans (6 big and one small) if we want to use them in a future
* old sy527 system need new fans (6 big and one small) if we want to use them in a future
* in general sy1527 needed at least 2U, better 3U of clear space underneas of mainframe; use side rails instead of shelfs

Revision as of 11:29, 23 February 2011

present: Sergey Boyarinov, Eugene Pasyuk, Nerses, Sergey Pozdnyakov, Mark Kibilko, ...

1. Downtime work

  • tagger restoration - couple weeks; tage recabling; 3 VME cpu needed; tage HV restoration; translation table for tage
  • microstrip detectors - need to see if working and use for tage calibration; if does not work, will calibrate later using other microstrips (HPS SVT ?)
  • trigger for g14 (HDIce) run, need to test level2 with new trigger version, or use previous one
  • LabView-EPICS communication to be implemented (Chris Bass and Nerses)
  • LAC: half of ADCs shows garbage, need to fix; TDCs were never tested after PRIMEX2
  • no CC


2. CAEN visit

  • DC HV replacement was discussed, 944 fast trip was important, will discuss how to implement it in sy1527
  • sy1527 boards testing conditions were discussed, will set better cooling and use every other slot; max power per channel is 8W, for tests we'll limit it to 7W and run 48 hours; also it is good to go up and down every hour
  • calibration boards for sy1527 will arrive in few month, JLAB personal was trained for calibration and repairs; we have spare channels and DC converter and fuses
  • old sy527 system need new fans (6 big and one small) if we want to use them in a future
  • in general sy1527 needed at least 2U, better 3U of clear space underneas of mainframe; use side rails instead of shelfs